ICSS/DCS/ESD

Egyptian Sugar & Integrated Industries Company

DCS for Ethyl Alcohol Production Plant, ABU KURKAS factory

  • Siemens DCS - PCS7 control system with redundant S7-400 hardware
  • Process Instruments, Control valves, Pressure and Temperature gauges
  • Hook up, Cables, Cable trays, .. etc.
  • 2 Work stations – PCS7 - UPS
  • Engineering, Commissioning & Startup

Enppi / Badr Petroleum Company-Shell

Design, Supply, Install, Commissioning and Startup of the ICSS for NEAG-1 field

   Dual hot redundant SIEMENS S7400FH, redundant fail safe I/O modules

  • Burner Management System (BMS): High availability safety system SIL3,

   Dual hot redundant SIEMENS S7400FH), Redundant fail safe I/O modules

  • SCADA: 8000 Tag, Redundant server, 50" Monitoring screen
  • Industrial Dual Redundant UPS System: 30KVA, NICD batteries,

   Back up time 2 HR

  • Pressurized Pre-fabricated control module that accommodate the ICSS
  • IP 54 Pressurized shelter (18 x 6 x 4.2m L x W x H)
  • Raised floor for cabling system
  • false ceiling for lighting/fire/HVAC
  • Explosion Proof Battery Room
  • Fire Alarm and FM200 fire Fighting System for the shelter

Central dual redundant Air conditioning system for the shelter