Metito Middle East ( UAE)
Sudan WTP.
Potable Water Treatment 5000 m3/d
Siemens S7-400H
 
Yokogawa ME /BP- Gupco, Prefabricated Shelter.
Main Contractor: Enppi
Badri offshore Platform
Locally manufactured Shelter.
Exp-H60 with9mx9mx305m
 
Enppi/IBSF
2 X 25 t/hr. Water tube boiler control & Monitoring system.
End user - Suez Oil Processing Refinery
 
IBSF – United Sugar (SAVOLA)
2 X 80 t/hr. Water tube boiler control & Monitoring system
 
SIIC- HAWAMDEIA Factory
BMS & Air to fuel Ratio Control
 
SIIC- KOMOMBO Factory
25 tons Boiler Revamp
 
KPC – KHALDA PETROLUEM Co
MCC Cabinets
 
Italcement – Qatamia Plant
MCC for new cement mill for grinding additives liquid mixture
 
Invensys Process Systems
MERLOSE.
No.12 System & Marshalling cabinets for DCS Systems
 
Invensys Process Systems
UGD.
No. 3 System & Marshalling for ESD System
 
Faraanah Contracting
SAKR Factory AOI.
Marsa Aalam Desalination Plant
 
Faraanah Contracting
Gharbia water Co..
Filter Auto/Manual washing system
 
Cairo West Power Station.
Demi/Raw Water Treatment
 
Abou-Quir Power Station
Demi/Raw Water Treatment
 
Badr Petroleum Co. - Bapetco
Electrical Distribution Synchronizing System for #5 generators housed inside shelter
 
Badr Petroleum Co. - Bapetco
Electrical distribution board housed in shelter.
 
KPC - KHALDA Petroleum Co
Consultant: ENPPI.
Medium voltage (11KV) withdrawable switchboard inside an air-conditioned shelter.
 
PETROJET
Consultant: ENPPI.
Supply and commissioning supervision AREVA MV switchgear.
 
ANRPC
ESD System ( Emergency shutdown system) Including Communication with SubSystems& DCS for NEW NAPHTHA HYDRO
 
BADR PETROLEUM CO. (BAPETCO)
Design, Engineering, Fabrication, Supplying, Installation, Commissioning and Start up of an Industrial UPS System for production Separator
 
Egyptian Maintenance Co. (EMC)
NPC - SUEZ Supply, Installation, Commissioning and Start up Soot Blower Control System
 
SUCO
Upgrade the existing control systems for Ruston TB5000 gas turbine driven generators
 
BADR PETROLEUM CO. (BAPETCO)
Supply, Installation, Commissioning and Start Up of Electrical project forNIAG 1 Concession at BAPETCO
 
PETROJET
Altube - Badr City
Supply, Installation, Commissioning and Start up of Emergency Shutdown System (ESD) Based on:
SIEMENS S7-400 FH (Fail Safe, Fault Tolerant and Redundant).
 
PETROLEUM PIPE LINE CO.
Upgrading the control system of Verga heater in Mostorad and El-Max sites.
 
Egyptian Maintenance Co. (EMC)
Burner Management System BMS and Control System for25 t/hr. Water tube boiler.
 
BADR PETROLEUM CO. (BAPETCO)
Electrical Distribution Board Type Tested
 
PETROLEUM PIPE LINE CO.
Supply, Installation, Commissioning and Startup of DAMANHOUR& El-Max Pumping Units Control System based
 
PETROLEUM PIPE LINE CO.
Upgrading the control system of SULZAR turbine at SUZE site.
 
Egyptian petrochemical Co. (EPC)
Upgrading the Control System for Industrial Waste Water Treatment Plant From Manual To Automatic
 
KHALDA PETROLEUM CO.
Medium voltage Switchgear (11KV) Installed inside an air-conditioned shelter
 
SUCO
Upgrading Emergency Shut Down / Process Shut Down (ESD/PSD ) and Fire &Gas (F&G) system,
 
BADR PETROLEUM CO. (BAPETCO)
Electrical Distribution Synchronizing System for 5 generators housed inside shelter
 
KHALDA PETROLEUM CO.
Supply, Installation, Commissioning and Start up of Automatic Tank gauging systems
 
PETROLEUM PIPE LINE CO.
Supply, Installation,Commissioning and Start up of Hellwan Station Control System SIEMENS PLC S7-300
 
PETROJET
Potash Factory Jordon
Supply, Installation, Commissioning and Start up of SIEMENS PLC S7-300 Control System for Potash Factory in Jordon
 
ESIIC
Kaus Sugar Factory
Pressure reducing station
 
Thyssen Group
Rakta for paper industries
Complete control system for 60 t/hr. Water tube boiler control & Monitoring
 
IBSF
Raqqa Sugar company (Syria )
Complete control system for 35 t/hr. Water tube boiler control & Monitoring :
• BMS control system with Oilon Burner equipment
 
ESIIC
Chemical Factory
Mitsubishi Boiler25 t/hrRevamp
 
East Delta Electricity Production Co
Attaka Power Station
Supply, Installation, Commissioning and Start up of Soot Blower Control
 
Cairo Electricity Production Co.
Cairo west Power Station
Design,Supply, Installation, Commissioning and Start Up of Control System For 6 Air Compressor
 
ESIIC
Edfu Sugar Factory
Condensate water control system
 
Air Liquide.
EZDEK.Alex,TCI.PortSaed,Saint Gobain. Suez Supply and Installation of PLC for SEGMA Project
 
Saint Gobain
Supply, Installation, commissioning and start up of Public address system
 
ESIIC
KomOmbo Sugar Factory
Local Control Panels and Field Ins. for BMS& Air to Fuel Ratio Control atkom-Ombo DIA boilers no.14, 15
 
ITC
Supply,Installation commissioning and start up of PLC,SCADA system
 
METITO
METITO( Ibshadatand BanyAmerElMenia)
Supply, Installation, Commissioning , Engineering and Start up of Ibshadat&BanyAmerW.T.P Control System
 
Inco Steel
Supply, Installation, commissioning and startup of S7-300 PLC system
 
Egyptian Iron & Steel co
Supply, Installation, commissioning and start up of PLC system &Alarm system for Oxygen unit
 
News
Tricom Controls achieved another milestone as ENI Zubiar project confirmed our registration (march-2012)
More...
 
Tricom Control Awarded ISO9001 & OHSAS 18001 certified by SGS
More...
Tricom Controls awarded SIEMENS best system integrator
More...
Tricom Controls awarded Neag1terminante surface facilities with Enppi
More...
Tricom Controls awarded BMS Boiler management system 18boiler in diff factory in ESIIC
More...
Tricom Controls awarded Mobile Power Distribution Station with BAPTCO
More...